Adani Group Supplies 65,000 Tonnes of High-Strength Cement for Chenab Bridge!

Nothing 53 2

The Adani Group, through Ambuja Cements and ACC, has played a pivotal role in the construction of the world’s highest railway arch bridge over the Chenab River in Jammu and Kashmir. The company supplied 65,000 metric tonnes of high-strength Ordinary Portland Cement (OPC) 43 Grade, ensuring durability and resilience in extreme climatic and geological conditions.

🔴 Key Highlights:

  • The Chenab Rail Bridge stands 359 meters above the river, making it the highest railway arch bridge globally.
  • The cement supplied by Adani Cement enhances the bridge’s structural integrity, reinforcing its ability to withstand seismic activity and strong winds.
  • Prime Minister Narendra Modi inaugurated the bridge, marking a historic milestone in India’s railway expansion.
  • The bridge connects Kashmir Valley with the rest of India, improving transportation and economic opportunities.
  • Adani Cement’s contribution underscores its commitment to nation-building, supporting India’s infrastructure growth.

📢 Adani Cement CEO Vinod Bahety’s Statement:
“It is a matter of immense pride for us to be part of a project that not only redefines engineering boundaries but also contributes to national integration.”

⚠️ Strategic Impact:

  • The Chenab Bridge strengthens India’s railway network, facilitating better connectivity in remote regions.
  • Adani Cement’s involvement highlights its role as a key player in India’s infrastructure development, ensuring quality and timely delivery.

👉 What do you think? Will the Chenab Bridge transform connectivity in Jammu and Kashmir? Drop your thoughts in the comments!
🔴 Share this post to celebrate India’s engineering marvel! 🚀🔥

Leave a Reply

Your email address will not be published. Required fields are marked *